A practical Ipswich project checklist for excavation, ground support, base, formwork, reinforcement and drainage before concrete is placed.
For service availability and a site-specific quote, discuss your requirements directly with the concreting business you choose.
Start with the site and project documents
Before work begins, confirm what is being built, the intended use, the required levels and which drawings or specifications apply. Structural slab requirements belong to the project design. Identify who is responsible for approvals, service location, excavation, spoil removal and arranging the concrete.
Excavation and ground conditions
Excavate only to the specified footprint and levels. The exposed ground should be checked for roots, loose material, soft or wet areas and inconsistent fill before it is covered. Unexpected conditions should be raised with the responsible contractor or designer rather than hidden beneath a generic layer of base material.
Base material and compaction
The required base or fill depends on the slab type, ground, project drawings and applicable requirements. Follow the specified material and compaction method. Do not assume that an arbitrary depth of gravel or unverified fill provides suitable support.
Check formwork, reinforcement and drainage
Formwork should match the agreed shape and levels and remain stable during placement. Confirm dimensions and transitions before concrete arrives, including door thresholds, adjoining paths, kerbs, service penetrations and existing slabs.
Keep reinforcement in its specified position
Where the design calls for reinforcement, it needs to be supported and secured as shown in the drawings. Reinforcement resting on the ground or displaced during placement may not be in its intended position. Do not choose bar size, spacing or cover from a generic homeowner checklist.
Plan where water will go
Surface falls and any required drainage need to suit the property, building, boundaries and authority requirements. Avoid directing water toward a building or neighbouring property. On reactive or unusual ground, drainage changes may need professional review because moisture conditions can affect support and movement.
Use a pre-pour check to clarify responsibilities
Before the pour, walk through the scope with the project team. Confirm access for people and delivery vehicles, site protection, form dimensions, reinforcement, concrete specification, finish, joints, drainage, curing and who will confirm access after placement. Keep plans and agreed changes together so everyone is working from the same information.
This checklist is general information, not an engineering specification or approval. For residential building slabs, the applicable NCC and project documents may require site-specific classification or design. See the slab thickness guide and concrete volume guide for related planning questions.
SOURCES & FURTHER READING
- NCC 2025 Housing Provisions: Footings, slabs and associated elementsAustralian Building Codes Board
- NCC 2025 Housing Provisions: EarthworksAustralian Building Codes Board
- Cementing your knowledgeQueensland Building and Construction Commission
- Concrete slab floorsYourHome, Australian Government